HEAD-TO-HEAD COMPARISON

Trello vs Notion: a ready-made board or a workspace you build

Trello gives you a ready-made model of boards, lists and cards. Notion gives you pages and databases, and you build the project tracker yourself.

We may earn a commission from qualifying referrals through our ClickUp links. Facts on this page come from each vendor's own pages, checked on the date above. How placement works

Choose Trello if

Trello fits teams that want to move cards across a board with little setup, and small teams that stay within 10 collaborators on the Free plan.

Choose Notion if

Notion fits teams whose projects are document-heavy and who want specs, wikis and task databases with timelines and dependencies in one workspace.

Trello and Notion compared from vendor sources checked on the date above
TopicTrelloNotion
Built aroundBoards of lists and cards in a Workspace. Cards carry due dates, attachments and checklists.Pages and databases. Each database row is a page with properties such as status, assignee and due date.
ViewsBoard on every plan. Calendar, Timeline, Table, Dashboard and Map views on Premium.Table, Board, List, Gallery, Calendar, Timeline and Chart layouts on any database.
Gantt and dependenciesNo Gantt view or task dependencies listed. The Premium Timeline view shows cards across dates.A Timeline layout, not called Gantt. Subtasks and dependencies on every plan, with three date-shifting options.
Free planUp to 10 collaborators and 10 boards per Workspace, unlimited cards, 250 command runs a month.Unlimited blocks for one person but limited for 2+ members, 5 MB uploads, 10 guests, 1 chart.
Seat and billing rulesWorkspace members are billable. Single-board guests from Standard; a guest on more than one board is billed as a member.Billed per member. External guests: 10 on Free, unlimited on paid plans.
AutomationBuilt into every board: 250 command runs a month on Free, 1,000 on Standard, unlimited on Premium. Monthly operations are capped on every plan.Basic buttons only on Free. Custom database automations from Plus.
Docs and wikiNo docs or wiki feature listed. Card descriptions and checklists carry the detail.Every page is a document, and Notion includes wikis and docs for the same price.
IntegrationsUnlimited Power-Ups per board on every plan, connecting tools such as Slack, Google Drive and Salesforce.Basic connections such as Slack and Google Drive on Plus. Premium connections such as GitHub and Asana on Business.
Time trackingNo native time tracking listed on the pricing page.No native time tracking found on the pages we checked.
Best suited toTeams moving work through stages that want a working board on the first day.Teams that write specs, briefs and notes next to their task lists and will design their own databases.
PricingCheck current Trello pricing ↗Check current Notion pricing ↗

The main difference

Trello and Notion can both run a team's projects, but they ask different things of you. Trello hands you a fixed model: a board, lists for stages and cards for tasks. Notion hands you pages and databases, and you decide what the project tracker looks like.

So the trade is setup time against flexibility. A Trello board works as soon as you add lists. A Notion tracker needs someone to create a tasks database, choose properties and add views, but it can hold the brief, the spec and the meeting notes inside each task.

How each organizes work

Trello's tour describes cards with due dates and reminders, drag-and-drop attachments, and checklists with a status bar that fills as you check items off. Inbox captures to-dos from email, Slack and Teams, and Planner puts cards on your calendar. On Free, Planner lets you view your scheduled cards on a calendar and sync events; time blocking, by dragging cards onto the calendar, starts on Standard. Boards live in a Workspace, and Free allows up to 10 boards per Workspace.

In Notion, each row in a database is its own page with properties. Notion's help center lists Table, Board, List, Gallery, Calendar, Timeline and Chart layouts, and the Board layout can serve as a Kanban board. A task database needs status, assignee and due date properties, and tasks assigned to you appear in My tasks. Task databases can also run sprints, with Current Sprint, Sprint planning and Backlog views.

Planning and timelines

  • Trello lists Timeline view on Premium and Enterprise, along with Calendar, Table, Dashboard and Map views. Its pricing page does not list a Gantt view or task dependencies.
  • Notion's Timeline layout plots items across dates. Its pricing page lists subtasks and dependencies on every plan, including Free. When you add dependencies you choose a date-shifting rule: shift only when dates overlap, shift and keep the time between items, or do not shift automatically.

If tasks must happen in sequence and dates should move together, Notion documents that and Trello does not. If your work is a flow of stages, Trello's board covers it without that setup.

Plans and limits to check

We do not publish prices because they change. Check Trello's and Notion's pricing pages for current numbers. The thresholds that usually decide the plan:

  • A second member on Notion Free: a shared workspace can add only a limited number of blocks. At the limit you can still read and edit existing content but cannot add new blocks. Trello Free lists unlimited cards; its limits are collaborators and boards.
  • An eleventh board or collaborator on Trello Free: that needs Standard, which removes both caps.
  • Guests: Trello lists single-board guests from Standard and bills guests on more than one board as members. Notion allows 10 external guests on Free and unlimited guests on paid plans.
  • Files: Trello Free allows 10MB per file; Notion Free allows 5 MB per upload.
  • AI: Trello lists AI features on Standard and Premium. Notion includes a limited trial of Notion AI on Free and Plus and Notion Agent on Business. Custom Agents, on Business and Enterprise, run on Notion credits bought separately.

Where Trello is stronger

  • A ready-made model of lists and cards that needs no database design.
  • A Free plan built for small teams, with unlimited cards.
  • Automation on every plan, including Free.
  • Unlimited Power-Ups per board on every plan.

Where Notion is stronger

  • Docs and wikis live next to tasks; each task is a page that can hold the brief or spec.
  • Subtasks and dependencies are listed on every plan, including Free, with date-shifting rules.
  • Notion's help center lists Calendar and Timeline as standard database layouts, and we found no plan restriction on them on its pricing page. Trello lists those views on Premium.
  • Task databases can run sprints, and sprints can complete automatically and start the next one.

How to decide

Ask who will build and maintain the setup. If nobody has time to design databases, start with one Trello board, a list per stage and one or two automation rules. If someone will own the workspace, build one Notion tasks database, turn it into a task database, and add a Board view for the team and a Timeline view for planning.

If your work needs linked dates or written specs beside each task, Notion is the closer fit. If it needs a shared board that works on day one for up to 10 people, Trello is.

Common questions

Does Notion have a Gantt chart?

Notion's database layouts include Timeline, which plots items across dates, and its pricing page lists dependencies between tasks on every plan. Notion does not call any of its views a Gantt chart on the pages we checked.

Can Trello hold documents like Notion?

Trello's pricing page does not list a docs or wiki feature; detail lives in card descriptions, checklists and attachments. Notion's Projects page says wikis and docs are included for the same price.

Does Trello or Notion track time?

Trello does not list native time tracking on its pricing page, and we did not find native time tracking on the Notion pages we checked.

Sources

Vendor pages used for this guide. Plans and features change, so confirm details on the vendor site before you buy.

Next step

Read the full review of each tool, or answer six questions to see which tools match your team.